Ten years of project inspection/resident engineer and special inspection experience on the San Diego Clean Water Program a $1.5 billion Capital Improvement Program to upgrade and build new wastewater treatment plants, outfalls, pump stations, trunk and interceptor sewer pipelines. Projects included
- New Sedimentation tanks and restoration of Sedimentation tanks
- New Digesters and restoration upgrades of existing digesters
- Digester gas mixing systems, piping and gas compressors.
- Central boiler facilities
- Power Co-generation upgrade
- Operations and control buildings
- Sludge pump-station
- Chemical feed systems
- Odor control systems
- Headwork's bar-screens and concrete restoration
- Grit removal pump and piping upgrades
- Force main isolation structures
- Process piping installation
- Rehabilitation of on-shore outfall
- Pump station No. 1 & 2 upgrades
Point Loma Wastewater Treatment Plant
Point Loma wastewater treatment plant sedimentation tanks restoration and odor removal systems upgrade
Two new sedimentation tanks 11&12 including new odor control systems
Construction of new digester No 8 tank floor
Digesters 7 & 8 and new excess gas flares at top right
New sludge pumping station
Cogeneration facility with two 2.3 megawatt (total 4.6) V12 engine generators
Pump Station 2 installation of ultrasonic flow meter spools for eight 50,000 GPM pumps